titlebannersmall
Services: Lab Fees and Turn-Around Time
Analysis

Price

1. Development of a USGA Putting Green Rootzone Mixture (Greensmix) - Complete physical & particle size analysis of sand, sand:peat mixes, particle density, % organic matter, pH & lime recommendation, & USGA recommendations for a greensmix. Up to three trial mixes.  Additional tests @ $50.00/sample. 2-3 days.

$350.00

2. Complete Rootzone Analysis - Complete duplicate physical analysis  (ASTM F1815), complete particle size analysis (ASTM F1632), organic matter analysis (ASTM F1647.A), pH and lime recommendations (ASTM D4972), and USGA recommendations for a putting green rootzone mixture (greensmix).  1-2 days.

$290.00

3. Complete Physical Analysis of Soil/Rootzone Mix (ASTM F1815) - Complete physical analysis to include water permeability rate, pore space distribution, bulk density, particle density, & water retention. 2 days.

$180.00

4. Complete Particle Size Analysis of Soil/Rootzone Mix (ASTM F1632 or ASTM 422) - Particle size analysis of sand, silt, & clay, & sand fractions, & USGA recommendations for a rootzone mix. 1 day.

$50.00

5. Organic Matter Analysis of Soil/Rootzone Mix (ASTM F1647 Method A) - Determined by loss on ignition. 1 day.

$50.00

6. Organic Matter of Peat & other Organic Soils (ASTM D2974) - Determined by loss on ignition. 1 day.

$50.00

7. Moisture Determination of Peat and Soils (ASTM D2974).  1 day.

$30.00

8. USGA Compatibility Test of Gravel and Rootzone Sand for golf green construction without the intermediate (choker) layer.  Including sieve analysis for bridging, permeability, and uniformity factors.  1 day.

 $100.00

9. Gravel Particle Size - Sieve analysis of gravel & USGA recommendations for golf green construction. 1 day.

$50.00

10. Intermediate Filter (Choker) Layer Particle Size - Sieve analysis of choker material & USGA recommendations for golf green construction. 1 day.

$50.00

11. Bunker (Trap) Sand Test - Complete physical & particle size analysis including particle shape, fried-egg lie, color, pH & USGA guidelines for selecting a bunker sand.

$210.00

12. Topdressing Sand/Mix Test - Complete physical & particle size analysis including pH & USGA recommendations for a topdressing sand/mix. 1-2 days.

$210.00

13. pH & Lime Recommendations (ASTM D4972) 1 day.

$10.00

14. Soluble Salts  & Recommendations (ASA) 1 day.

$10.00

15. Chemical Analysis (Available Upon Request) - Soil Fertility analysis for P, K, Ca, Mg, Zn, & Mn & fertilizer recommendations and pH and lime recommendations. approx. 1 week.

$50.00

16. Cation Exchange Capacity (CEC). approx 1 week.

$30.00