| 1. |
Development of a USGA Putting Green Rootzone Mixture (Greensmix)
- Complete physical & particle size analysis of sand, sand:peat mixes, particle
density, % organic matter, pH & lime recommendation, & USGA recommendations for a
greensmix. Up to three trial mixes. Additional tests @ $50.00/sample. 2-3 days. |
$350.00 |
| 2. |
Complete Rootzone
Analysis - Complete duplicate physical analysis (ASTM F1815), complete particle size
analysis (ASTM F1632), organic matter analysis (ASTM F1647.A), pH and
lime recommendations (ASTM D4972), and USGA recommendations for a putting green rootzone
mixture (greensmix). 1-2 days. |
$290.00 |
| 3. |
Complete Physical
Analysis of Soil/Rootzone Mix (ASTM F1815) - Complete physical analysis to include
water permeability rate, pore space distribution, bulk density, particle density, &
water retention. 2 days. |
$180.00 |
| 4. |
Complete Particle
Size Analysis of Soil/Rootzone Mix (ASTM F1632 or ASTM 422) - Particle size
analysis of sand, silt, & clay, & sand fractions, & USGA recommendations for a
rootzone mix. 1 day. |
$50.00 |
| 5. |
Organic Matter
Analysis of Soil/Rootzone Mix (ASTM F1647 Method A) - Determined by loss on
ignition. 1 day. |
$50.00 |
| 6. |
Organic Matter of
Peat & other Organic Soils (ASTM D2974) - Determined by loss on ignition. 1
day. |
$50.00 |
| 7. |
Moisture Determination of Peat and Soils (ASTM D2974). 1 day. |
$30.00 |
| 8. |
USGA Compatibility Test of Gravel and Rootzone Sand for golf
green construction without the intermediate (choker) layer.
Including sieve analysis for bridging, permeability, and uniformity factors. 1 day. |
$100.00 |
| 9. |
Gravel Particle
Size - Sieve analysis of gravel & USGA recommendations for golf green
construction. 1 day. |
$50.00 |
| 10. |
Intermediate
Filter (Choker) Layer Particle Size - Sieve analysis of choker material & USGA
recommendations for golf green construction. 1 day. |
$50.00 |
| 11. |
Bunker (Trap) Sand
Test - Complete physical & particle size analysis including particle shape,
fried-egg lie, color, pH & USGA guidelines for selecting a bunker sand. |
$210.00 |
| 12. |
Topdressing
Sand/Mix Test - Complete physical & particle size analysis including pH &
USGA recommendations for a topdressing sand/mix. 1-2 days. |
$210.00 |
| 13. |
pH & Lime
Recommendations (ASTM D4972) 1 day. |
$10.00 |
| 14. |
Soluble
Salts & Recommendations (ASA) 1 day. |
$10.00 |
| 15. |
Chemical Analysis
(Available Upon Request) - Soil Fertility analysis for P, K, Ca, Mg, Zn, & Mn
& fertilizer recommendations and pH and lime recommendations. approx. 1 week. |
$50.00 |
| 16. |
Cation Exchange Capacity (CEC). approx 1 week. |
$30.00 |